It has now been two years since the installation of (the) metal interlocking shingles on the roof of my residence in Ottawa. As I indicated to the salesman at the time, if after two years I was totally satisfied with the installation and performance of my new roof I would take the time to extol the virtues of the Interlock system. To date, I have indeed been most impressed with the performance of my roof. Prior to installation of the Interlock system, I was required to change the asphalt shingles on my roof every eight to ten years.
roof review
|
Since it was installed over my existing roof, I saved the cost of having to have the old roof stripped off. Furthermore, there are the additional savings of never having to put on, or strip off any future roofs. For that matter, I will never again have the worry and stress of getting another roof. I am well ahead of the game, and I have no regrets about my choice of Interlock. Mississauga, Ontario |
|
|
Loading...
Call 1-866-545-0288 now or see more at OntariosBestRoof.com![]()
©2010 Interlock Industries (Ont) Inc. All rights reserved. Interlock logo is a Registered Trademarks of I.E.L. Manufacturing Ltd.
TEFLON® is a registered Trademark of E.I. du Pont de Nemours and Company used under license.
The ENERGY STAR name and the ENERGY STAR symbol are registered trademarks of the United States Environmental Protection Agency and are used with permission.
TEFLON® is a registered Trademark of E.I. du Pont de Nemours and Company used under license.
The ENERGY STAR name and the ENERGY STAR symbol are registered trademarks of the United States Environmental Protection Agency and are used with permission.
